The RP2000 Rail Shear has significant benefits that reduce cost to the industry:

This is achieved by:
     • Significant time reduction for the complete cut and collection process.
     • Reduces the length of possession time for scrap clearing.
     • Eliminates the added cost of secondary machines, operators, attachments, machine controller and risk.
     • Reduction of haulage and transport costs.

Typical Operation Performance:

We estimate that this shear has the capability, subject to conditions to produce one full cut cycle and move to next cutting point every 25 seconds. This will significantly reduce the time needed to collect scrap rail which is currently lying out on the infrastructure. Therefore from a productivity point of view the PR2000 will allow more rail to be collected in a shorter possession time.

WEIGHT
WIDTH
HEIGHT

MAX WORKING
PRESSURE

MAX ROTATION
PRESSURE
CUTTING FORCE

EXCAVATOR WEIGHT
(BOOM MOUNT)

EXCAVATOR WEIGHT
(LIPPE MOUNT)
2,300 kg
1,487 mm
1,778 mm
350 bar
100 bar
1,000 tons
17 tons
21 tons